docs: mark test plan implementation status · Entire
docs: mark test plan implementation status
2f04953·
Soph·1w ago·1 file·+10 added/-1 removed
Groups A/C/D/E/F(1,2,4,5)/G delivered on this branch; B-group blocked on decision D-1, F6 deferred, two pinned behaviors await product decisions.
Co-Authored-By: Claude Fable 5 noreply@anthropic.com Claude-Session: https://claude.ai/code/session\_012yi3hHGAGepwfrfjPETjGq
Sessions
4f990d0112c0View transcript
[?
Comprehensive Checkpoint Testing CoverageCodex·GPT-5.5·2 steps](/content/gh/entireio/cli/session/019f22a2-95f4-7d71-8140-4d86b0d40aa5#timeline-4f990d0112c0/index.html)
Changes
1
docs/testing
Mgit-remote-test-plan.md+10/-1
1
2
3
3
4
5
6
7
8
9
10
11
12
13
14
15
# Test Plan: Git Remote Operations & Upstream Resolution — Both Checkpoint Backends
Status: proposal, 2026-07-04.
Status: implemented on this branch, 2026-07-04 (originally a proposal; kept as the coverage map). Delivered: infrastructure I-1/I-2/I-4, groups A, C (incl. C5/C6), D, E, F1/F2/F4/F5, G1–G3, plus two fixes surfaced along the way (a graceful-degradation test false-positive and explain's git-refs fallback masking fetch errors as "checkpoint not found"). Still open: the B-group (blocked on decision D-1 below), F6 (needs an injectable provider host table), and the two pinned behaviors awaiting product decisions — the >1000-commit replay cap (`TestCollectCommitsSince_CommitCapPinsCurrentBehavior`; the historical fix 4cf01edb3 was never merged) and the two-remote queue-clearing gap (`TestGitRefsQueue_TwoRemotesQueueClearedByFirstPush`, decision D-2).
Scope: e2e (`e2e/tests/`) + integration (`cmd/entire/cli/integration_test/`) coverage for everything that talks to a git remote — pre-push checkpoint sync, remote/upstream resolution, cross-machine fetch — for the **git-branch** (`entire/checkpoints/v1`) and **git-refs** (`refs/entire/checkpoints/<shard>/<id>`) backends.
---
Mdocs/testing/git-remote-test-plan.md+10/-1